Set up in 10 minutes, built simple on purpose, and owned for life, with your products moved across for you.
Your founding price is held for

Lifetime access, for the next 100 founders
The price is rising soon.
A simple app that runs every project's schedule and profit in one place, set up in about ten minutes.
Instant access, online, the moment you join.
But that is where the hours go. Building a product list from scratch for every new project. Hunting down the right price again. Hiding columns so a client never sees the markup. Fixing a total that broke the moment a formula slipped.
Here is the part worth knowing. This is not a discipline problem.
Spreadsheets were built for accountants, not for fixtures, finishes and furniture. Used for design work, they get messy fast, and they quietly swallow close to a day of every week.
Most solo studios run on these manual, patched-together files, and many cannot say what profit a project actually made.
One library of products they reuse across every project. Profit tracked quietly in the background. Client documents that look the part, with the private numbers kept private. That one shift is what gives the day back.

Every product, every room, with your profit on each line.
Insight holds your products, your schedules and your profit in a single place, so every client project starts ready instead of from a blank page.

Enter each product once, then reuse it everywhere.
Lay out fixtures, finishes and furniture room by room.
Hold your cost and the client price on every line.
Share a clean schedule with your markup hidden by a tick.
Present a single product, on brand, in seconds.
Put your logo and colours on every export.
In about ten minutes, add your settings and your products. Prefer not to? Send us your list and we move it across for you.
For each client, pull products straight from your library into room-by-room schedules. Track the profit as you go.
Every new project starts from your library, so you never build from a blank page again, and the studio scales without the admin piling up.
Most tools make you choose. Simple but thin, or powerful but heavy and charged per person every single month.
Insight puts the studio's whole schedule and profit in one place, simple enough to start today, and owned once instead of rented forever.
It removes the two things that stop designers switching: a steep, week-long setup, and a bill that grows with every project and every seat. Add your entire studio at no extra cost, and keep the tool for life.

I'm Ellie, a former designer, and if the admin side of design has ever stolen an evening, this was built for exactly that.
For years the design work was the easy part. It was the schedules, the pricing and the client documents that ate the nights and weekends. Like most designers, I did what everyone said. Bought more templates. Tried the big platforms. Some cost more each year than the work they saved.
But something kept nagging. Every project, I rebuilt the same lists and re-hid the same columns. Then it clicked. The problem was never me. It was running design work on tools that were never built for it.
So I built the one I wanted back then. Simple, owned once, and made for the way designers actually work.

Send us your spreadsheet or current app export and we load your products for you, then set you up on a short call. You start with a full library, not a blank screen.
Value $97 - included freeFive simple calculators for your fee, your budgets, your quantities, your space planning and your software costs. Yours to keep, whether or not you stay.
Value $52 - included freeTotal bonus value: $149, yours free with your founding seat
| What matters | Insight (founding) | Spreadsheets | Programa | Houzz Pro |
|---|---|---|---|---|
| Every project in one place | Yes | No | Yes | Yes |
| Profit tracked automatically | Yes | By hand | Yes | Partial |
| Client-safe exports | Yes, one tick | By hand | Partial | Partial |
| Reuse products across projects | Yes | Re-type each time | Yes | Yes |
| Whole studio included | Yes, unlimited | n/a | Per seat | Per seat |
| Set up in about 10 minutes | Yes | n/a | Heavy setup | Heavy setup |
| What it costs | $97 once | Costs you time | ~$71/mo | $149-249/mo |
A founding seat is $97, one time. The plan price is $49 a month. So a founding seat is the same as two months of the plan, and then nothing again, ever. Set against software that runs around $71 a month, it pays for itself before the season changes.

True, and on purpose.
The big platforms try to do everything, and designers tell me they feel heavy and slow to learn. Insight does the core job beautifully, and starts in minutes.
The features people ask for next are already on the way, and founding members get every one of them free, for life. You get the simple app now, and the bigger app later, without paying a cent more.
Own the app that runs every project from one place, keeps your profit clear, and gives you back a day a week. One payment. Your whole studio. Every upgrade free, for life.
Your price is held for
Set up in 10 minutes. Owned for life.
